First, the tower crane classification way which kinds of
Tower crane is often referred to as the tower crane, is commonly used on construction sites lifting machinery, tower cranes of many kinds, according to different ways of classification can be divided into different types, the common way of classification of tower cranes have the following kinds:
1, According to the walking mechanism can be divided into mobile tower crane and fixed tower crane:
(1) Mobile tower crane according to the different walking device can be divided into track type, tyre type, car type, crawler type four.
Track-type tower crane tower body is fixed on the walking base frame, can be run on a dedicated track, good stability, can walk with the load, high efficiency, and therefore widely used in construction and installation projects. Tyre-type, car-type and crawler-type tower crane without track device, easy to move, but can not walk with the load, stability is poor, has been rarely produced.
(2) Fixed tower cranes are divided into two types according to the different mounting positions, namely, attached self-lifting type and internal climbing type.
Attached to the ascending tower crane can rise with the building and rise, suitable for high-rise buildings, the building structure only to withstand the horizontal load transmitted by the crane, attached to the convenient, but occupies the structure of more steel; within the climbing crane inside the building (lift shafts, stairwells), with the help of a set of brackets and lifting systems for climbing, jacking is more cumbersome, but occupies the structure of less steel, does not need to be equipped with foundations, all the self-weight and loads are The whole self-weight and load are borne by the building.

2,According to the construction characteristics of the lifting arm can be divided into pitch luffing jib (moving arm) and trolley luffing jib (flat arm) tower cranes.
(1)Pitch luffing jib tower crane relies on the lifting and lowering of the jib without achieving luffing, and its advantage is that it can give full play to the effective height of the jib, and the mechanism is simple.
(2) Trolley amplitude lifting arm tower crane is by the horizontal lifting arm track mounted on the trolley walking to achieve amplitude, the advantage is that the amplitude range is large, loaded trolley can be driven close to the tower, with load amplitude, the disadvantage is: the lifting arm force situation is complex, high structural requirements, and the lifting arm and trolley must be in the upper part of the building, the tip of the tower mounting height of the building than the roof should be higher than the 15-20 m.
3,According to the tower structure can be divided into lower slewing (tower slewing) and upper slewing (tower does not slew) tower cranes.
(1) The lower slewing tower crane will be slewing bearing, balancing weight of the main institutions are set in the lower end, the advantages are: the tower is subjected to less bending moment, low centre of gravity, good stability, easy to install and maintain, the disadvantage is that the slewing bearing requirements are higher, the installation of the height is limited.
(2) The upper slewing tower crane will be slewing bearing, balancing weight, the main institutions are set in the upper end, the advantage is that because the tower does not rotate, can simplify the lower structure of the tower, jacking plus section convenient. Disadvantages are: when the building exceeds the tower height, due to the influence of the balance arm, limiting the crane's slewing, while the centre of gravity is higher, the wind pressure increases, the pressure weight increases, so that the total weight of the machine increases.

4, According to the crane installation can be divided into folding transport, the whole of their own erection of fast installation of tower cranes and need to use auxiliary machinery for assembling and disassembling tower cranes.
(1) Can be set up on their own quickly installed tower cranes are small and medium-sized under the rotary tower crane, mainly used for short construction period, the requirements of frequent movement of the low-rise building, the main advantage is to improve efficiency, save installation costs, save time, save labour, save materials, the disadvantage of the structure is complex, the maintenance of a large amount.
(2) Need to be disassembled by auxiliary tower cranes, mainly used for medium and high-rise buildings and large working range, large lifting capacity of the place, is currently the main types of machines on the construction site.

Second, how to choose the right type of tower crane
There are many types of tower cranes, mainly designed for different construction needs, then how to choose the right type of tower crane?
Tower crane selection principle has a great deal of uncertainty, the specific project should determine the appropriate type of tower crane, can not be small instead of large, nor can large instead of small. Selection of tower cranes suitable for the construction of the project, the need for construction, machinery, installation of three aspects of practical experience in the joint consultation of personnel, taking into account the construction environment, construction needs, crane parameters and other factors, it is possible to come up with more satisfactory results. Selection if the error occurs, it may cause significant economic losses, or even accidents.